The process of installing a polyaspartic floor coating is between 1 to 2 days depending on the size of the flooring, but what is the process like? check the captions of the photos to find out!
Step 1
Surface preparation is the first step in any polyaspartic floor coating project. Our experts use an industrial grinder to open the pores of the concrete and minimize the risk of errors.
Step 2
Before applying the coating, any cracks or damage to the concrete will be corrected by our team to ensure a smooth and flawless finish. This is part of the surface preparation process, which is crucial in any polyaspartic floor coating project.
Step 3&4
Step 3 involves applying the base coat to make sure that the final coat and color look even.
In Step 4, we sprinkle the paint flakes in the customer's color of choice.
Step 5
The final step in a polyaspartic floor coating project involves the application of a clear coat for decorative purposes. This top coat is added after the primer has cured and can incorporate metallic effects and other decorative pieces.